Project Development & Documentation
New postUse this area to ask your questions specifically about Project Development & Documentation (PDD).
Show all
Sort by votes
-
stairway width MINIMUMS : 1011.2 stairways (44”) and 1009.3 stairways (48”)-2 votes 3 comments
-
Table 1006.2.1, huh?-2 votes 12 comments
-
Table 707.3.10 “between fire areas”?-2 votes 1 comment
-
bearing it non bearing walls for Tables 602 and 602?-2 votes 14 comments
-
mixed use: 508.4 change of occupancy classification?-2 votes 0 comments
-
OCLF Table 1004.1.2: gross versus net?-2 votes 0 comments
-
chapter 8 finishes?-2 votes 0 comments
-
plenum depth vis-vis-beams and girders?-2 votes 1 comment
-
structure versus duct or other designations?-2 votes 6 comments
-
overturning moment (what the what?)-2 votes 3 comments
-
structural definitions (Mc, My, Dt, IQ, Ib etc)-2 votes 2 comments
-
heat loss calculations for slab on grade and basement for PDD?-2 votes 0 comments
-
tributary area, column, girder and beam sizing?-2 votes 1 comment
-
structural references W shapes-2 votes 5 comments
-
PPD & PDD Pass Same Day-2 votes 8 comments
-
CHARTS for PDD?!-3 votes 1 comment
-
acoustic, lighting and hvac problem sets-3 votes 1 comment
-
safety glazing citations in IBC or IRC?-4 votes 5 comments
-
ASSEMBLY without FIXED seat: concentrated, standing space unconcentrated-4 votes 3 comments
-
PDD resources in the exam help?-6 votes 0 comments