Is the cost in "Cost plus fixed fee" the construction cost or the cost of the archi. firm needs to run the project?(Overhead+direct labor)?

Comments

1 comment

  • Avatar
    Andrew Russell

    If you are looking at the construction type of Cost plus Fixed Fee, it is the cost of the materials and labor to install / construct / build the project plus a fixed fee for the GC to do the job. So, no matter if the cost of the project goes up or down, the GC gets paid the same fee.