ARE- CE -Architect Led Design Build

Comments

2 comments

  • Avatar
    sreedevi

    A, B, C, D are correct

    E. incorrect. Schedule and control means and methods of construction are still a licensed general contractor's responsibility.

    F. incorrect. This is an operational task

     

    0
    Comment actions Permalink
  • Avatar
    Dannympoto

    I agree

    0
    Comment actions Permalink

Please sign in to leave a comment.

Powered by Zendesk