(April 30, 2026 @ 6pm ET) Problem Solving - An Expert’s Process for Answering ARE Questions - PT 21 (Case Studies)
This week's Amber Book: 40 Minutes of Competence program is titled, “Problem Solving - An Expert’s Process for Answering ARE Questions - PT 21 (Case Studies)”
This will be a little different from our usual Problem Solving sessions. We'll talk about the recent case study changes and a few of our strategies for tackling case study questions.
These study sessions are free and open to all, not just Amber Book subscribers, so join us this Thursday at 6pm ET: https://us02web.zoom.us/j/83922907346
You’ll take the first five minutes of class to answer this week's question alone, but if you would like to get a head-start on that, here is the assignment:
Refer to the case study documents here.During a site visit, the architect observes that a wall of an egress stair enclosure is constructed with one layer of gypsum board on each side.Given the design shown in the contract documents, what is the MOST accurate characterization of this condition?A. Minor deviation that does not affect overall performanceB. Acceptable field modification due to schedule constraintsC. Non-conforming work compromising life safetyD. Contractor means and methods decision
Please sign in to leave a comment.
Comments
0 comments