Figure 9.1 Relationships of Project Participants
Hello,
is there any other OCD wanna-be-architect who thinks this Figure (9.1) should be revised as attached?
I am referring to the CM as Contractor project delivery.
If the A and the C in the Design Build graphics are shown separate but within the same entity, I think the graphics should be consistent, and with the CM as Constructor we should see both CM and C within the same entity....
This is the original graphic:
Thank you
Regards
Please sign in to leave a comment.