In AIA Document C401, Document between Architect and Consultant, is the architect liable for the errors and omissions of the consultant?
I thought that by stamping/signing their own drawings the consultant was taking responsibility for their work and the architect was not responsible for errors and omissions.
-
Hi Julia,
Please refer to this Gang Chen's reply in this link
https://are5community.ncarb.org/hc/en-us/community/posts/360037605233-Traditional-Design-Bid-Build-RFI-Flow-Chart?page=1#community_comment_360009865574best
Kun