Should the Architect put observations of construction means and method on the field report?
I encountered two similar questions in Black Spectacles but two different answers:
the Architect observed incorrect/unsafe construction means&methods in the filed, should the architect: 1)Note it in the field report; OR
2)Do nothing
Obviously no doubt, means and methods are contractor's responsibility, but I believe the Architect should put it in writing if he/she notices unsafe/incorrect practice.
Any thoughts?