  • Avatar
    Erin Hickey

    I did not memorize numbers. I studied generally what sections are in Masterformat and how to find information quickly.

    0
    Comment actions Permalink
  • Avatar
    Nathaniel Landreville

    Miko, you should know what in each division but not necessarily every specification section. These are the ones you’d be most likely to be asked about:
    01 00 00 - General Requirements
    02 00 00 - Existing Conditions
    03 00 00 - Concrete
    04 00 00 - Masonry
    05 00 00 - Metals
    06 00 00 - Wood, Plastics, and Composites
    07 00 00 - Thermal and Moisture Protection
    08 00 00 - Openings
    09 00 00 - Finishes
    10 00 00 - Specialties
    11 00 00 - Equipment
    12 00 00 - Furnishings
    13 00 00 - Special Construction
    14 00 00 - Conveying Equipment
    21 00 00 - Fire Suppression
    22 00 00 - Plumbing
    23 00 00 - Heating, Ventilating, and Air-Conditioning (HVAC)
    25 00 00 - Integrated Automation
    26 00 00 - Electrical
    27 00 00 - Communications
    28 00 00 - Electronic Safety and Security
    31 00 00 - Earthwork
    32 00 00 - Exterior Improvements
    33 00 00 - Utilities