ARE5 Practice Exam - Question 144

Comments

3 comments

  • Avatar
    Gustavo Diez-Presilla

    When the contractor bids he has to stick with the time frame gave it by the owner, the always talk about the cost going over the architect estimate; in that they have at least 3 options the meet that cost, but nobody says a thing about time

    0
    Comment actions Permalink
  • Avatar
    Tyler Corbley

    I am using the same book. You are correct and the book has an error. If you look at the answer explanations, 144 says the answer is A, Owner and the explanation supports that, directly contradicting the answer key at the end of the test.

    0
    Comment actions Permalink
  • Avatar
    Sandra Victoria Camejo Minns

    Thank you for confirming, that’s what I thought. Just wanted to make sure.

    0