RFI Type 3 Code/Contract Information: 8 or 10 hour point?
Page 817 of AHPP: The 4th paragraph says that the Type 3 would receive 10-hour point, however, in the 8th paragraph as well as the Table 12.1 at the bottom, it's caculated as 8-hour point?
-
But in the 4th paragraph, it clearly says "Type 3: Code/Contract Information RFI. This RFI involves adding code-related issues and project scope errors or omissions. A Type 3 RFI is the most serious and complicated to process, taking approximately eight or more LH of FTEs. Therefore, for calculation, this type of RFI would receive a 10-hour point".
Well, at the same time, the Table 12.1 at the bottom does show it's 8 hour...
-
Just wanted to chime in here and say that I have been working in this field fully for 16 straight years, doing full Construction Administration on many, many projects, and I have never once heard of or encountered in real life an RFI "type." This question baffles me, surprised that there is even such a thing. Not saying that you might not need to know this for the exam, mind you, but sure as heck won't ever use it in real practice.
Please sign in to leave a comment.
Comments
8 comments