AIA contracts- Refrences
Are the AIA contracts available during the PjM exam? The ARE guidelines (page 65) says the contracts are available for the Case Study. Does this mean if there's a question in the discrete section related to the contracts, I could go to the Case Study section to look them up?
-
You will get some excerpts from the contracts related to the case study questions. So, it most likely won't be the entire list of AIA contracts—just a few pages of the related ones. If you don't take a break, you can review these contract pages and other excerpts from case studies. But once you take a break, the system locks the questions you have already seen and answered, meaning it doesn't allow you to access or modify them. I recommend quickly reviewing the list of case study excerpts at the beginning of your exam to see what resources you can benefit from. Even list them on a whiteboard page so you don't forget. Refer to them as you go through multiple choice (MC) questions if you get lucky enough to have some MC questions from the same contact excerpts in the case studies. NCARB generally claims they don't expect people to memorize codes or contracts to answer the questions.
-
Thank you Elif for completing or correcting my words. Yes, I should have said if you take a break before your case studies which is my way and not necessarily the correct way for you or the only way, then the questions that you have seen will be locked. But now Elif is introducing another approach for taking the test which is smart. Maybe you just look at one of each case study questions and you'll know which AIA contracts or pages of them are available for you.
Please sign in to leave a comment.
Comments
6 comments