Travertine tiles on mortar bed

Comments

3 comments

  • Avatar
    Orlando McRae

    I would question why there is so much slope in the structure creating a large void. It is causing the tile to act as a structural bridge across the floor drain. 

    0
    Comment actions Permalink
  • Avatar
    mermann

    the tile covers the drain

    3
    Comment actions Permalink
  • Avatar
    amukot

    Lol, I see it now - thanks Michael! 

    0
    Comment actions Permalink

Please sign in to leave a comment.

Powered by Zendesk