Division 00 Specs vs. Bidding Requirements

Comments

4 comments

  • Avatar
    Andrew Hankermeyer

    The Project Manual begins with Division 00, (Bidding and Contracting Documents) Division 01, (General Requirements), and ends with Division 02 thru 49. (referred to as the Specifications consisting of the 3 part Section Format.)

    Be aware of the relationships between these 3 Divisions.  Supplementary Conditions modify the General Conditions (A201) which influences the General Requirements (Div. 01) that influence Part 1: General portion of the Section Format.  Which then complements the Drawings.  Extreme coordination is required to make sure that things are only said once.   Refer to CSI Manual of Practice pp. 5.40 for a diagram. 

    0
    Comment actions Permalink
  • Avatar
    Cody Zimmerman

    Are construction documents considered a design phase?

    0
    Comment actions Permalink
  • Avatar
    Miriam Ramirez Lopez (Edited )

    Yes, according to AHPP Construction Documents is a design phase normaly with 40% or 45% (including Bidding / Negotiations). 

    0
    Comment actions Permalink
  • Avatar
    Cody Zimmerman

    Thank you!!

    0
    Comment actions Permalink