When to incorporate design requirements of AHJ?

Comments

2 comments

  • Avatar
    Joel Edwards

    Yeah I agree the wording is a little ambiguous. What they most likely mean here is incorporating AHJ design requirements determined during previous phases.

    If the task said “determine design requirements of AHJ” then it would be dragged into SD or DD phase area.

    0
    Comment actions Permalink
  • Avatar
    Rebekka O'Melia

    Hi Natalia,

    The FAR, building height, etc other basic massing regs are addressed in section 2, schematic design where it says "review applicable laws, codes, and regulations".  The design requirements in section 4 would be more detailed building code requirements -  things like stair height & width, fire ratings, for example.  I think if they used the word 'codes' rather than AHJ, it would be more clear.

    Hope this helps!

    Rebekka O'Melia, R.A., NCARB, B. Arch, M. Ed, NOMA, Step UP ARE 5.0 Courses

    0
    Comment actions Permalink