Practice management delivery of service practice question

Comments

2 comments

  • Avatar
    Daniel Wachtveitl

    I found this question irritating because there is nothing that excludes the electrical contractor from being responsible. The question states that the GC observed the error; however, in professional experience the E.C can make the mistake or folllowing the drawing incorrectly or even looking at the wrong plan. The question (to me) alludes that there was regular coordination between the A/E so it would stand to reason that the lights were  graphically in the correct location.

    Overall, terribly written question.

    0
    Comment actions Permalink
  • Avatar
    Joshua Kieb

    I thought this question was confusing as well. Perhaps the answer is in the contract listed in the question. Honestly, I haven't retained much knowledge on the contracts.

    0
    Comment actions Permalink